Important Tips: Basement Bathroom Installation

Installing basement bathroom is a very difficult task; however, there are a few tips that will be useful for you. The first and foremost tip is to plan everything carefully before starting the construction. Start with the up-flush toiler as it is often an ideal option for below grade installations. Sink drains and bathtub can likewise be attached to a few models. Try to place the basement bathroom right below the upstairs bath for simpler connections to the sewer drains and water lines. Don’t forget to support the new water supply line, install extra wiring for the toilet area, as well as to check all the connections twice, before closing the walls.

Careful Planning is a key to success
Careful planning is crucial when considering to install basement bathroom plumbing. It is wise to map out the location as well as the size of current water supply line and the general setup of the sewer drainage system. With careful planning, the task will be accurate and much easier. What kind of tools do I need for basement bathroom plumbing? Decide it in advance and have the tools ready before starting the work. It is a good idea to keep some temporary caps on hand, to stop any remaining drains.

Sewage Ejection
Basement bathroom plumbing usually needs some kind of sewage ejection technique to transport waste-water to the upper level drain. An up-flush toilet is typically the best option for this sewage ejection plumbing work. Why? Because an up-flush toilet is particularly intended for “below grade” use, and it also provides its own pump and holding tank. An extra electrical circuit will be required to function this particular type of toilet.

Essential tips for basement bathroom installation
When starting, it is best to install new fixtures directly below the current upstairs bath; this will make the installation of basement bathroom plumbing easy as this particular location eliminates the requirement for difficult or awkward pipe connections. Locate the new piping near the existing piping as well, because this will save your time as well as the material costs. If you want to reduce the workload of the pumping system, then think about the closeness to a preexisting sewer drain. If the location is occupied or not available, plan in advance to ensure a functioning sewer connection.

Bottom line- Important tips for basement bathroom installation
All piping should be properly supported and protected. Plastic pipes should be supported at 1.8m intervals. Galvanized and copper piping should be supported at 2.4 m. Do not install any piping near the interior wall surface as it may lead to damage from wallboard fasteners. Before installing the wallboard, check all the drainage connections and water supply.